Segmented in 7h 05m 28s by
Beskrivning
Part 1.5: Part 2: Part 3: Part 4: Part 5: A small improvement, but this time with semi-blind Stage 4 and 5 :D Run it self felt a bit better improvement. In segment 4 Lost a lot of time due to loads (Laptop started to hiccup). Probably will try to beat this after some proper practice.
Senaste omgångarna
Nivå: Drag: Tunnel Construction
Nivå: Street-X: Industrial Park Track 1
Postad
6 svar
Postad
0 svar