Explaining How I'll Be Re Timing Runs
Using the original timing rules i'll be re timing every run so that we all have consistent times. I'll load each run into premier make a cut before the first frame or partial frame after the loading screen. Then I'll make a cut after the first frame of the 2d Dora and whatever time premier tells me that clip length is will be my assumed accurate time of that run. Feel free to assess my methods so that this is a fair ordeal.