Tools
No Tools
Splits
No Splits
Saves
No Saves
Patches
No Patches
Run Timing
I have changed the timing methods for both campaign and co-op to remove loads. Runs going forward will simply be the sum of each of the 3 race times. Please make sure to show the time at the end of each race to make verification easier. Runs still need to be single segment as well. I have retimed
Recent runs
Level: Navajo Arch
Level: Navajo Arch
Level: Wasteland
Level: Desert Bloom
Moderators